Case Study

Analysing a multi-lot tender documentation

We went through a voluminous documentation, separated the requirements by lot and surfaced the restrictive points before the decision to bid.

Analysis AnalysisMultiple lots

Context

The company was considering a procedure with several lots and needed to understand quickly where it could realistically take part.

Challenge

The documentation was large, and the requirements differed from one lot to another.

  • Requirements scattered across several documents.
  • Differences between lots, hard to compare.
  • A short deadline before submission.

How we intervened

We mapped the documentation lot by lot and marked the points that could affect eligibility.

  • We separated the requirements for each lot.
  • We marked the potentially restrictive points.
  • We summarised what the company could cover with its own resources.

Result

The company could decide which lots to bid for, with the reasons written down.

A clear comparison between lots

Restrictive points identified in time

A documented decision to take part

Have a similar situation?

We can analyze the context and propose a suitable work method.