Case Study

Planning needs and structuring the annual plan

Collecting needs became a predictable flow of prioritisation and documentation, with a solid basis for the annual procurement plan.

Planning PlanningContracting authority

Context

The institution collected its needs differently from one department to another, and the annual plan was assembled late and under pressure.

Challenge

Without a common way of collecting needs, the plan could not be defended line by line.

  • Needs sent in different formats.
  • No link between the need and the budget line.
  • Changes without a documented cause.

How we intervened

We established a single way of collecting needs and the minimum content of each request.

  • We set the minimum fields of a needs memo.
  • We linked each need to its funding source.
  • We established how changes are recorded.

Result

The plan was built from documented needs, and each line could be traced back to its origin.

A single way of collecting needs

Each line traceable to a memo

Changes with a documented cause